CCGT Plant with Integrated CCS Facility
Sector: Wind • Location: Stallingborough, United Kingdom
Source: The Chemical Engineer
RWE has appointed Technip Energies and GE Gas Power to conduct a pre-FEED study for a new natural gas-fired combined cycle gas turbine (CCGT) plant with a fully integrated carbon capture and storage (CCS) facility near Stallingborough, UK. The proposed plant aims to generate up to 800 MW of power, sufficient for 1 million homes, and will partner with the Viking CCS project.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | RWE has appointed Technip Energies and GE Gas Power to conduct a pre-FEED study for a new natural gas-fired combined cycle gas turbine (CCGT) plant with a fully integrated carbon capture and storage (CCS) facility near Stallingborough, UK. The proposed plant aims to generate up to 800 MW of power, sufficient for 1 million homes, and will partner with the Viking CCS project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
