CCSU Student Center Renovation
Sector: Education • Location: New Britain, Connecticut, United States
Source: Construction Equipment Guide
The project involved the demolition and renovation of the student center at Central Connecticut State University (CCSU), expanding the facility to better serve the needs of students. The renovation included repaving the parking area and improving drainage and lighting.
- Status
- Closed
- Sector
- Education, Waste Processing and Treatment, Car parking, Automotive
- Location
- New Britain, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Construction Equipment Guide
ConstructChat
Ask ConstructChat about CCSU Student Center Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involved the demolition and renovation of the student center at Central Connecticut State University (CCSU), expanding the facility to better serve the needs of students. The renovation included repaving the parking area and improving drainage and lighting. |
Original sector | Education |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | New Britain |
Source
Source | Construction Equipment Guide |
URL |
More Details
Record type | Project |
Sector | Education, Waste Processing and Treatment, Car parking, Automotive |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
