CDBG-Dr Area O-12
Sector: Water Supply and Storage • Location: Panama City, Florida, United States of America
Source: Dodge
Construction of utility improvements to include sanitary sewer and water main along the following streets within the City of Panama City: E 4th St. from Oak Ave. to McKenzie Ave., Oak Ave. from E 4th St. to Luverne Ave., Park Ave. from Beach Dr. to Luverne Ave., Luverne Ave from Oak Ave. to E 4th St., E 3rd Ct. from Park Ave. to McKenzie Ave., and Magnolia Ave. from E 3rd Ct. to E 4th Street. This
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Road, Waste Processing and Treatment, Government
- Location
- Panama City, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CDBG-Dr Area O-12
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of utility improvements to include sanitary sewer and water main along the following streets within the City of Panama City: E 4th St. from Oak Ave. to McKenzie Ave., Oak Ave. from E 4th St. to Luverne Ave., Park Ave. from Beach Dr. to Luverne Ave., Luverne Ave from Oak Ave. to E 4th St., E 3rd Ct. from Park Ave. to McKenzie Ave., and Magnolia Ave. from E 3rd Ct. to E 4th Street. This work includesthe installation of the proposed utilities as well as removal of existing utilities... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Panama City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Road, Waste Processing and Treatment, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
