logo
ProjectClosed

CDBG Sidewalk Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The major items of work include construct sidewalks on the south side of 5th Street NE, including approximately 215 feet from A St NW to A St NE and 1.30 feet from B Street NE to Auburn Avenue. The sidewalks will be 5 feet wide with 5.5sfbot-wide land-scape strips. The project includes modifying the curb :ramp at A St NE, replacing three commercial driveway aprons and one residen-tial driveway apr

Status
Closed
Sector
Commercial, Car parking, Water Supply and Storage, Road, Waste Processing and Treatment, Automotive, Government
Location
Auburn, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CDBG Sidewalk Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CDBG Sidewalk Improvements” is an infrastructure initiative in the Commercial sector, located in Auburn, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The major items of work include construct sidewalks on the south side of 5th Street NE, including approximately 215 feet from A St NW to A St NE and 1.30 feet from B Street NE to Auburn Avenue. The sidewalks will be 5 feet wide with 5.5sfbot-wide land-scape strips. The project includes modifying the curb :ramp at A St NE, replacing three commercial driveway aprons and one residen-tial driveway apron, and upgrad-ing the existing 20 manhole and sewer rings and covers with new 24 rings and covers.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Auburn

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Water Supply and Storage, Road, Waste Processing and Treatment, Automotive, Government

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project