CDBG Utility Improvements REBID
Sector: Water Supply and Storage • Location: Bowling Green, Florida, United States of America
Source: Dodge USA
The project is generally described as installation of grit classifier equipment and new manual bar screen in existing wastewater treatment facility headworks, replacement of two high service pumps at water production facility, rehabilitation (lining) of four lift station wet wells and rehabilitation of sanitary sewer manholes.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Commercial
- Location
- Bowling Green, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CDBG Utility Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is generally described as installation of grit classifier equipment and new manual bar screen in existing wastewater treatment facility headworks, replacement of two high service pumps at water production facility, rehabilitation (lining) of four lift station wet wells and rehabilitation of sanitary sewer manholes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Bowling Green |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
