CDBG Water Utility Improvements
Sector: Power Transmission • Location: Cambridge City, Indiana, United States of America
Source: Dodge USA
The Project includes the following Work: The project consists of improvements to the Town of Dublin s water supply, treatment, and distribution system. Improvements to the water supply system include the replacement of existing well pumps on Well No. 1 and Well No. 2, replacement of discharge valves on Well No. 1, and chemical cleaning of both (2) supply wells. Work at the existing water treatment
- Status
- Under Construction
- Sector
- Power Transmission, Water Supply and Storage, Chemical (Industrial), Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Cambridge City, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CDBG Water Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: The project consists of improvements to the Town of Dublin s water supply, treatment, and distribution system. Improvements to the water supply system include the replacement of existing well pumps on Well No. 1 and Well No. 2, replacement of discharge valves on Well No. 1, and chemical cleaning of both (2) supply wells. Work at the existing water treatment plant (WTP) includes the installation of a new supervisory control and data acquisition (SCADA) ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Cambridge City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Chemical (Industrial), Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
