CDE POWER EMERGENCY MEASURES
One of 3,154 projects Taiyo tracks in Dominican Republic.
Source: European Investment Bank (EIB)
Extension to the CDE Power Project (935087). Emergency measure. Repair of damages caused by Huricane Georges to the 138 kV power transmission line from Hainamosa to San Pedro de Macoris.
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Dominican Republic
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about CDE POWER EMERGENCY MEASURES
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | fully reimbursed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Extension to the CDE Power Project (935087). Emergency measure. Repair of damages caused by Huricane Georges to the 138 kV power transmission line from Hainamosa to San Pedro de Macoris. |
Original sector | Energy |
Location
Country | Dominican Republic |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Dominican Republic
- Punta Catalina Power Project
- Luperon Hotel - Beach Resort
- Development of a touristic project in Las Canas Marina Beach Resort & Club - Marina Construction
- Puerto Colon Marina & Golf Villages3- Construction of golf course/villas and amphitheater
- Construction of Hydroelectric Central Plant - Las Placetas
- Santanasol Solar Project
- Monte Plata Solar
- Monte Plata Solar Power Plant
