logo

CDPQ Infra and CN enter into an agreement, a decisive step for the Réseau électrique métropolitain (REM) project

Sector: Bridge • Location: Canada

Source: Caisse de dépôt et placement du Québec

Project
Unknown

As part of its Réseau électrique métropolitain (REM) project update, CDPQ Infra announced today that it has entered into an agreement with CN. The agreement marks a decisive step in the development of the REM project as a unified, integrated system, with Central Station as the intermodal hub linking four metropolitan branches. Under the agreement, CDPQ Infra will acquire the aerial structure leadi

Project Information FAQ

Project Information

2 Q
The project “CDPQ Infra and CN enter into an agreement, a decisive step for the Réseau électrique métropolitain (REM) project” is an infrastructure initiative in the Bridge sector, located in Canada. Taiyo aggregates data on it from Caisse de dépôt et placement du Québec.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

As part of its Réseau électrique métropolitain (REM) project update, CDPQ Infra announced today that it has entered into an agreement with CN. The agreement marks a decisive step in the development of the REM project as a unified, integrated system, with Central Station as the intermodal hub linking four metropolitan branches. Under the agreement, CDPQ Infra will acquire the aerial structure leading to Central Station (Viaduc du Sud) from CN, allowing the REM to access the station directly. The agreement also allows the REM to use Central Station and run under CN’s tracks in the Pointe-Saint-Charles sector. In addition to facilitating the integration of different public transportation networks through Central Station, the agreement allows CDPQ Infra to significantly reduce the impacts of the REM project on the urban fabric. As such, heritage buildings, including the Rodier Building, and various residential and commercial buildings, will be fully preserved. The use of existing structures also eliminates the need to build parallel tracks and close Saint-Paul, William and Dalhousie Streets, thereby avoiding further inconvenience for citizens. false false false The agreement between CDPQ Infra and CN provides for the acquisition of land, buildings, structures, bridges, as well as rail infrastructure between Bridge and Saint-Antoine Streets in a central area of Montréal. The three operators of passenger services (AMT – Mont-Saint-Hilaire line, AMTRAK and VIA Rail) that currently use the Viaduc du Sud will not be affected by its acquisition by CDPQ Infra. The REM project will require construction work and potential changes to the structure. This work will be carried out without interfering with existing passenger services. false false false

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data