CEC Africa 57 MW HFO Power Project
Sector: Commercial • Location: Sierra Leone
Source: Multilateral Investment Guarentee Agency (MIGA)
This summary covers equity investments and shareholder loans by CEC Africa Investment Limited of Mauritius and TCQ Power Limited of the British Virgin Islands through their subsidiary, CEC Africa (Sierra Leone) Limited of Mauritius, for the development of a 57-MW greenfield thermal power plant in Sierra Leone on a build-operate-transfer basis. The investor has applied for a MIGA guarantee of up t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This summary covers equity investments and shareholder loans by CEC Africa Investment Limited of Mauritius and TCQ Power Limited of the British Virgin Islands through their subsidiary, CEC Africa (Sierra Leone) Limited of Mauritius, for the development of a 57-MW greenfield thermal power plant in Sierra Leone on a build-operate-transfer basis. The investor has applied for a MIGA guarantee of up to $60 million for a period of up to 15 years against the risks of transfer restriction, expropriation, war and civil disturbance, and breach of contract. The proposed project includes a power station with seven generating units, transmission connections to the distribution networks, and a fuel supply facility. Additional World Bank Group support through an IDA guarantee and IFC loans is expected. Environmental Categorization The project is a category B under MIGA's Policy on Environmental and Social Sustainability. Click here to view the Environmental and Social Review Summary prepared by IFC for its investment in the project. Development Impact The proposed project would provide heavy fuel oil base power generation capacity in Sierra Leone— a country with a substantial power generation deficit—and help balance out the high seasonality in Sierra Leone's installed hydropower generation capacity. The project will strengthen private sector participation in the power sector and in Sierra Leone in general. MIGA's support for this project is aligned with the agency's priorities of supporting investments into countries eligible for financing from the International Development Association and countries affected by conflict. In addition, the World Bank Group's Joint Country Assistance Strategy for Sierra Leone emphasizes energy investment as one of its three priority areas, especially as the country recovers from the widespread outbreak of the Ebola virus. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
