logo

Cedar and Henry Street - Watermain replacement to address water quality issues, and Stormsewer construction

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This project will include the replacement of the water main, sanitary sewer repairs and the reconstruction of the road including storm sewers. One of the storm sewer outlets for the Cedar Street project is located on Henry Street, so it will be necessary to reconstruct the existing storm and sanitary sewers on Henry Street as part of the project. Therefore, the block of Henry Street between Everet

Project Information FAQ

Project Information

5 Q
The project “Cedar and Henry Street - Watermain replacement to address water quality issues, and Stormsewer construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will include the replacement of the water main, sanitary sewer repairs and the reconstruction of the road including storm sewers. One of the storm sewer outlets for the Cedar Street project is located on Henry Street, so it will be necessary to reconstruct the existing storm and sanitary sewers on Henry Street as part of the project. Therefore, the block of Henry Street between Everett Street and Cedar Street has been included as part of this project. The storm sewer outlet on Henry Street will have its storm sewer extended, a continuation of the project from a few years ago where the portion from Coleman St. to Everett St. had a storm sewer installed as part of the Everett St. Sewer Separation Project. The project will also address water quality issues experienced. The water main is shallow and was installed in 1920; replacement is needed. Significant colour issues were experienced in the Cedar St. water main every time the fire hydrant was operated at the fire hall at the end of Cedar St. This indicates an issue on the inside pipe wall of the water main. The hydrant has been removed from regular service until the pipe is replaced. The road surface is in poor condition, and is on a bus route, this makes the project a candidate for reconstruction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data