Cedar Boulevard Parking Lot Addition Phase 2
Sector: Car parking • Location: Pittsburgh, Pennsylvania, United States of America
Source: Dodge USA
In 2013, the first phase of the Cedar Boulevard Parking Lot Project was completed. The proposed second phase of this project will allow for additional recreational parking towards Vee Lynn Drive and will accommodate an additional 58 vehicles with paved parking (35 current spaces). It may also include the enhancement of a rain garden as an environmentally friendly method to help control the storm w
- Status
- Prospective
- Sector
- Car parking, Government, Water Supply and Storage, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Pittsburgh, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cedar Boulevard Parking Lot Addition Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2013, the first phase of the Cedar Boulevard Parking Lot Project was completed. The proposed second phase of this project will allow for additional recreational parking towards Vee Lynn Drive and will accommodate an additional 58 vehicles with paved parking (35 current spaces). It may also include the enhancement of a rain garden as an environmentally friendly method to help control the storm water runoff from the site. The Municipality/Commission of Mt Lebanon may be seeking a consultant ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Pittsburgh |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Government, Water Supply and Storage, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
