Cedar Brook Dr Water Main Replacement
Sector: Water Supply and Storage • Location: Franklin Township, New Jersey, United States of America
Source: Dodge USA
For the Lump Sum and Unit Prices bid under the various Contract items, the Contractor shall furnish all materials, equipment, and labor required to perform work to install 12 High Density Polyethylene (HDPE) pipe on Cedar Brook Drive. It shall also include installing new tees, new gate valves, new hydrants and valves, replacing curb boxes and curb shutoffs and installing meter pits for residential
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Residential, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Franklin Township, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cedar Brook Dr Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For the Lump Sum and Unit Prices bid under the various Contract items, the Contractor shall furnish all materials, equipment, and labor required to perform work to install 12 High Density Polyethylene (HDPE) pipe on Cedar Brook Drive. It shall also include installing new tees, new gate valves, new hydrants and valves, replacing curb boxes and curb shutoffs and installing meter pits for residential homes at all locations (meter pit materials provided by the Township), for backfilling of trench... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Franklin Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Residential, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
