logo
ProjectPre-Construction

Cedar Creek Drainage Pump Station

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: Infrastructure Canada

The Cedar Creek Drainage Pump Station provides flood protection for people and properties situated behind the dike in a catchment area of 507 ha. The drainage catchment area for the pump station drains Hyde Creek, Cedar Creek, Watkins Creek and West Smiling Creek. Cedar Creek has a history of flooding affecting properties and roads in the drainage catchment area. The existing pump is inadequate to

Status
Prospective
Sector
Raw Materials, Commercial, Residential, Road, Waste Processing and Treatment, Government
Location
British Columbia, Canada
Updated
19 Nov 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Cedar Creek Drainage Pump Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cedar Creek Drainage Pump Station” is an infrastructure initiative in the Raw Materials sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Cedar Creek Drainage Pump Station provides flood protection for people and properties situated behind the dike in a catchment area of 507 ha. The drainage catchment area for the pump station drains Hyde Creek, Cedar Creek, Watkins Creek and West Smiling Creek. Cedar Creek has a history of flooding affecting properties and roads in the drainage catchment area. The existing pump is inadequate to convey creek flows to the Pitt River, and do not provide flood protection for climate change impacts such as increased rain fall and sea level rise. Additionally, the current configuration does not permit fish passage when the pumps are operating. The surrounding low-lying areas and roads currently flood during the 2-year storm, with more widespread flooding occurring in the 10-yr and 100-yr storm events. Consequences include property damage (residential, commercial and agricultural), business interruptions or losses, and access disruption (road closures).

Original sector

Climate Resilience

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Raw Materials, Commercial, Residential, Road, Waste Processing and Treatment, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project