Cedar Hills Interim Facility Relocation Project (Farwest)
Sector: Automotive • Location: Maple Valley, Washington, United States of America
Source: Dodge USA
The Farwest site will be developed to support landfill operations, which will include relocation of Operations, Vehicle Maintenance, Stores, and other units. For the Farwest site this will include utility tenant improvements, installation of two office modulars, and parking spaces.
- Status
- Closed
- Sector
- Automotive, Car parking, Commercial, Power Transmission, Residential, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Maple Valley, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cedar Hills Interim Facility Relocation Project (Farwest)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Farwest site will be developed to support landfill operations, which will include relocation of Operations, Vehicle Maintenance, Stores, and other units. For the Farwest site this will include utility tenant improvements, installation of two office modulars, and parking spaces. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Maple Valley |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Car parking, Commercial, Power Transmission, Residential, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
