Cedar Hills Regional Landfill Onsite Relocation
Sector: Water Supply and Storage • Location: Maple Valley, Washington, United States of America
Source: Dodge
The work on this project con-sists of relocating multiple existing modular buildings to the South Ops area and the North Flare Station of the Cedar Hills Regional Landfill, as well as tenant improvements in two existing modular buildings, development of new structures and storage areas, new parking spaces and access ramp. Work includes but is not limited to demolition, site clearing and grading, i
- Status
- Under Construction
- Sector
- Water Supply and Storage, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Cement, Waste Processing and Treatment, Government
- Location
- Maple Valley, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cedar Hills Regional Landfill Onsite Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work on this project con-sists of relocating multiple existing modular buildings to the South Ops area and the North Flare Station of the Cedar Hills Regional Landfill, as well as tenant improvements in two existing modular buildings, development of new structures and storage areas, new parking spaces and access ramp. Work includes but is not limited to demolition, site clearing and grading, installation of utilities, stormwater and sewer collection, concrete pad installation, moving mult... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Maple Valley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Cement, Waste Processing and Treatment, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
