Cedar Lee Meadowbrook Project
Under construction · Ohio · Last reported Mar 2025
Source: Cleveland 19 News
The Cedar Lee Meadowbrook Project, formally named 'The Marquee at Cedar Lee,' was a construction project that faced a significant setback due to a fire that rendered the building unsalvageable. Demolition began two months after the fire, which occurred while the building was still under construction.
- Status
- Under Construction
- Sector
- Road, Commercial
- Location
- Cleveland Heights, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Cleveland 19 News
ConstructChat
Ask ConstructChat about Cedar Lee Meadowbrook Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Cedar Lee Meadowbrook Project, formally named 'The Marquee at Cedar Lee,' was a construction project that faced a significant setback due to a fire that rendered the building unsalvageable. Demolition began two months after the fire, which occurred while the building was still under construction. |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Cleveland Heights |
Source
Source | Cleveland 19 News |
URL |
More Details
Record type | Project |
Sector | Road, Commercial |
Article published date | 2025-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
