Cedar Street Culvert Crossing
Sector: Water Supply and Storage • Location: Stratford, Ontario, Canada
Source: Dodge USA
The intent of this project is to remove the existing twin 1350mm dia. culverts and reinstate a single 1350mm dia. culvert. The Contractor will also be required to install 30m of 150mm watermain offset under the proposed culvert and perform all necessary road restoration as identified on the contract drawing.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Stratford, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cedar Street Culvert Crossing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The intent of this project is to remove the existing twin 1350mm dia. culverts and reinstate a single 1350mm dia. culvert. The Contractor will also be required to install 30m of 150mm watermain offset under the proposed culvert and perform all necessary road restoration as identified on the contract drawing. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Stratford |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
