logo
ProjectClosed

CEEE DISTRIBUTION

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

The project is part of CEEE's program for the expansion of its power subtransmission and distribution system in the State of Rio Grande do Sul during the period 1980-84. It includes the connection of about 35,000 new low-income urban consumers. CEEE's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in CEEE's service area, mostly

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Consumer Products, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CEEE DISTRIBUTION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CEEE DISTRIBUTION” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is part of CEEE's program for the expansion of its power subtransmission and distribution system in the State of Rio Grande do Sul during the period 1980-84. It includes the connection of about 35,000 new low-income urban consumers. CEEE's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in CEEE's service area, mostly related to industrial growth. The program will also make public service electricity available to about 12 new rural consumers. The project includes the following: construction of about 90 circuit-km of subtransmission lines at 138 kV, and about 550 circuit-km at 69 kV, and installation of about 1,000 MVA of additional transformer capacity; construction of about 800 circuit-km of distribution lines at 23 kV and 13.8 kV, about 6,000 circuit-km of low voltage lines, and installation of about 300 MVA of additional transformer capacity and about 580,000 meters, for the connection of about 325,000 new consumers; study on conversion of rice irrigation pumping throughout the State of Rio Grande do Sul from direct diesel drive to electric drive; and about 300 man-months of consultants' services for a program to improve CEEE's operations.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Consumer Products, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project