logo

CEEE DISTRIBUTION

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Closed

The project is part of CEEE's program for the expansion of its power subtransmission and distribution system in the State of Rio Grande do Sul during the period 1980-84. It includes the connection of about 35,000 new low-income urban consumers. CEEE's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in CEEE's service area, mostly

Project Information FAQ

Project Information

5 Q
The project “CEEE DISTRIBUTION” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is part of CEEE's program for the expansion of its power subtransmission and distribution system in the State of Rio Grande do Sul during the period 1980-84. It includes the connection of about 35,000 new low-income urban consumers. CEEE's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in CEEE's service area, mostly related to industrial growth. The program will also make public service electricity available to about 12 new rural consumers. The project includes the following: construction of about 90 circuit-km of subtransmission lines at 138 kV, and about 550 circuit-km at 69 kV, and installation of about 1,000 MVA of additional transformer capacity; construction of about 800 circuit-km of distribution lines at 23 kV and 13.8 kV, about 6,000 circuit-km of low voltage lines, and installation of about 300 MVA of additional transformer capacity and about 580,000 meters, for the connection of about 325,000 new consumers; study on conversion of rice irrigation pumping throughout the State of Rio Grande do Sul from direct diesel drive to electric drive; and about 300 man-months of consultants' services for a program to improve CEEE's operations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data