CEEE DISTRIBUTION
Sector: Water Supply and Storage • Location: Brazil
Source: World Bank Group
The project is part of CEEE's program for the expansion of its power subtransmission and distribution system in the State of Rio Grande do Sul during the period 1980-84. It includes the connection of about 35,000 new low-income urban consumers. CEEE's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in CEEE's service area, mostly
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Consumer Products, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CEEE DISTRIBUTION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is part of CEEE's program for the expansion of its power subtransmission and distribution system in the State of Rio Grande do Sul during the period 1980-84. It includes the connection of about 35,000 new low-income urban consumers. CEEE's overall program, of which the project forms a part, will provide the facilities required to serve the expected loads in CEEE's service area, mostly related to industrial growth. The program will also make public service electricity available to about 12 new rural consumers. The project includes the following: construction of about 90 circuit-km of subtransmission lines at 138 kV, and about 550 circuit-km at 69 kV, and installation of about 1,000 MVA of additional transformer capacity; construction of about 800 circuit-km of distribution lines at 23 kV and 13.8 kV, about 6,000 circuit-km of low voltage lines, and installation of about 300 MVA of additional transformer capacity and about 580,000 meters, for the connection of about 325,000 new consumers; study on conversion of rice irrigation pumping throughout the State of Rio Grande do Sul from direct diesel drive to electric drive; and about 300 man-months of consultants' services for a program to improve CEEE's operations. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Consumer Products, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
