CEFCO Convenience Store 426 Pace FL
Bid results · Florida · Last reported Mar 2024
Source: Dodge USA
Ground up CEFCO. Steel and ACM by JIMCO. Install owner-provided Fuel Tanks. Concrete Paving throughout site. Stone and EIFS exterior. Tile and Epoxy Flooring at Interior.
- Status
- Closed
- Sector
- Automotive, Cement, Commercial, Steel, Metal, Residential, Manufacturing (Industrial)
- Location
- Pace, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CEFCO Convenience Store 426 Pace FL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ground up CEFCO. Steel and ACM by JIMCO. Install owner-provided Fuel Tanks. Concrete Paving throughout site. Stone and EIFS exterior. Tile and Epoxy Flooring at Interior. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Pace |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Cement, Commercial, Steel, Metal, Residential, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
