logo
ProjectBid Results

Celina Summit Retail - Celina, TX

Bid results · Texas · Last reported Aug 2025

Source: Dodge

Ground-up multi-tenant retail shell (12,623sf) with associated site work (5.58ac) & TxDOT work. - All RFIs due by Thursday, June 20th - Monument signs are owner furnished and installed, power by GC. Please break out the following items pertaining to the retention pond. o Grading & Excavation specific to the pond, retaining wall, box culverts, etc. o Retaining wall o Box Culverts & Headwalls o Side

Status
Closed
Sector
Steel, Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Car parking, Automotive
Location
Celina, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Celina Summit Retail - Celina, TX

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Celina Summit Retail - Celina, TX” is an infrastructure initiative in the Steel sector, located in Celina, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ground-up multi-tenant retail shell (12,623sf) with associated site work (5.58ac) & TxDOT work. - All RFIs due by Thursday, June 20th - Monument signs are owner furnished and installed, power by GC. Please break out the following items pertaining to the retention pond. o Grading & Excavation specific to the pond, retaining wall, box culverts, etc. o Retaining wall o Box Culverts & Headwalls o Sidewalks, fencing, landscaping & lighting surrounding retention pond o TXDOT Access Drive on Preston...

Budget

Location

Country

United States of America (USA)

State

Texas

City

Celina

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Steel, Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Car parking, Automotive

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project