CELL 201-241 Stuart ST
Sector: Commercial • Location: Boston, Massachusetts, United States of America
Source: City of Boston
As more fully shown on the plans submitted herewith, the Facility would consist principally of the following elements to be located within and on the rooftop of the Building:
- Twelve (12) panel antennas, twelve (12) wall-mounted remote radio heads (“RRHs”) and three (3) wall-mounted surge arrestors (four (4) antennas, four (4) RRHs and one surge arrestor in the southwest corner of the Building’
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Cement, Natural Gas, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about CELL 201-241 Stuart ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | As more fully shown on the plans submitted herewith, the Facility would consist principally of the following elements to be located within and on the rooftop of the Building: 1. Twelve (12) panel antennas, twelve (12) wall-mounted remote radio heads (“RRHs”) and three (3) wall-mounted surge arrestors (four (4) antennas, four (4) RRHs and one surge arrestor in the southwest corner of the Building’s 5th floor, and eight (8) antennas, eight (8) RRHs and two (2) surge arrestors in the southern corner of the Building’s 5th floor), all to be stealth mounted behind “RF-friendly” glass at a centerline elevation of 50’+ above ground level; 2. Two (2) equipment cabinets in the southern corner of the Building’s 5th floor; 3. One 30-kW natural gas-fired back-up generator and booster on the Building’s rooftop adjacent to T-Mobile’s existing diesel-fired back-up generator; and 4. Overhead power, telco, natural gas and ground conduits running from the antennas and associated equipment to vertical conduits in an existing utility chase that runs to the Building’s basement (Verizon’s utility meter is proposed to be located in the Building’s existing basement electrical room, and its natural gas meter is proposed to be located with the existing natural gas meters already in the basement). The equipment to be located on the Building’s 5th floor will be enclosed by 8’ tall chain link fence, and the back-up generator and booster on the Building’s roof will be enclosed on three sides by an existing 41”+ tall by 12”+ wide concrete wall and the fourth by an existing guardrail. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Cement, Natural Gas, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
