CELL
Open · Massachusetts
Source: City of Boston
The Applicant proposes to modify the existing wireless telecommunications facility by replacing three (3) existing panel antennas with three (3) new panel antennas, together with supporting equipment. The proposed antennas will be entirely concealed within the existing canisters. Because the proposed antennas will be entirely concealed this modification should not require BRA design review approva
- Status
- Prospective
- Sector
- Broadband, Telecommunications, Commercial, Government
- Location
- South Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about CELL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Applicant proposes to modify the existing wireless telecommunications facility by replacing three (3) existing panel antennas with three (3) new panel antennas, together with supporting equipment. The proposed antennas will be entirely concealed within the existing canisters. Because the proposed antennas will be entirely concealed this modification should not require BRA design review approval. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | South Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Broadband, Telecommunications, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
