ProjectCompleted

CELSE

One of 10,000+ projects Taiyo tracks in Brazil.

Source: International Finance Corporation (IFC)

CELSE Centrais Elétricas de Sergipe S.A. (“CELSE” or the “Sponsor”) is developing the Power Plant Port of Sergipe I (“Project”), a greenfield gas-fired combined cycle thermal power plant and associated infrastructure. CELSE was created in 2015 by EBRASIL- Eletricidade do Brasil and Golar Power (a joint-venture between Golar LNG and Stonepeak Infrastructure Partners). The project consists of a 1,50

Status
Closed
Sector
Water Supply and Storage, Raw Materials, Seaport, LNG, Geothermal, Natural Gas, Road, Manufacturing (Industrial), Power Generation (CCGT), Wind, Government
Location
Brazil
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about CELSE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CELSE” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

CELSE Centrais Elétricas de Sergipe S.A. (“CELSE” or the “Sponsor”) is developing the Power Plant Port of Sergipe I (“Project”), a greenfield gas-fired combined cycle thermal power plant and associated infrastructure. CELSE was created in 2015 by EBRASIL- Eletricidade do Brasil and Golar Power (a joint-venture between Golar LNG and Stonepeak Infrastructure Partners). The project consists of a 1,500 MW combined-cycle power plant using three GE 7HA.02 gas turbines (GTs) with corresponding Heat Recovery Steam Generators (HRSG) and one steam turbine (ST). It will be connected to the grid via a 34.2 km double circuit 500-kV transmission line and air-insulated connection bay linking to an existing substation with potential to receive up to 3,000 MW.  The project further includes a fully dedicated chartered floating storage and regasification unit (FSRU) with a storage capacity of 170,000 m3 and a liquefied natural gas (LNG) regasification capacity of up to 14 million m3/day with a Submerged Soft Yoke (SSY) mooring structure. The FRSU will be located 6.5 km offshore and will connect to the power plant via an 18-inch diameter offshore and onshore gas pipeline to transfer the regasified LNG (RLNG) from the FSRU to the combined-cycle power plant. Seawater cooling towers will be used for the condenser cooling. The water intake and cooling water discharge are located offshore, and are connected to the power plant with pipelines that follow routing along to the RLNG pipeline with a seawater pumping station located on-shore.The power plant will be constructed on a 511,622 m² site located in the Municipality of Barra dos Coqueiros, approximately 20 km from Aracaju, the capital of Sergipe State, in northeastern Brazil. The project is potentially the first of three gas-fired power plants to be developed by CELSE’s Sponsors at the site. As per initial studies, CELSE’s Sponsors intends to pursue development of two additional gas-fired plants within the same site area, for a total of approximately 3,000 MW of generating capacity although timing of future developments has yet to be determined.The FSRU, named “Golar Nanook”, is a new FSRU with a regasification capacity of 14 million m3/ day, currently under construction at the Samsung Heavy Industries (SHI) shipyard. LNG delivery to the FSRU will be through Ship-to-Ship (STS) process. The FSRU is being chartered to the project by Golar Power, one of the Project Sponsors. The submerged pipeline will lie on the seabed except for the nearshore portion which will be buried. Once past the shoreline the pipeline continues for a distance of 1.5 km and terminates at a gate which has three branches (Porto de Sergipe I and two future facilities).General Electric (GE) is under a turnkey Engineer Procure Construct (EPC) contract to provide the power plant, the 34.2-km transmission line, the substation expansion, and the sea-water intake/discharge infrastructure for the power plant’s cooling requirements. The installation of the SSY and the construction of the gas pipeline will be contracted under separate EPC contract with Sapura Energy. For the operational phase of the project, CELSE has selected GE as the operations and maintenance (O&M) contractor for the power plant and GOLAR LNG as the O&M operator for the FRSU.The transmission line will have a 70-meter wide right-of-way (ROW) and an approximate total of 60 towers. The TL will cross the municipalities of Barra dos Coqueiros (site of the power plant), Santo Amaro das Brotas, Laranjeiras and Nossa Senhora do Socorro (site of the CHESF’s Jardim Substation and the proposed CELSE’ bay).The site of the power plant had previously been cleared and prepared to serve as an industrial site and is located near the State Road SE-100 and 1.2 km from Praia do Jatoba, on the Atlantic Ocean, near the Community of Praia do Jatoba. The power plant site is separated from the Community of Praia do Jatoba by the Wind Farm Barra dos Coqueiros. An existing marine terminal “Terminal Maritimo Inacio Barbosa (TMIB)” is located adjacent, and south/southwest of the power plant site. The TMIB will be used to receive large pieces of equipment for the project. State road SE-100 is located immediately to the west of the power plant site and provides a connection to local communities including the City of Aracaju. The project will operate as a backup base load power plant and is expected to dispatch to the national grid between 30-50% of the time, as required by the Electric System National Operator (ONS – Operador Nacional do Sistema Eletrico). The power plant is currently under construction with start of operation scheduled for January, 2020. The FSRU construction is expected to be completed by the second semester of 2018 and will arrive at the site during the last quarter of 2018. Total project cost is estimated at US$ 1.8 billion, and IFC proposed investment in the project is up to US$ 200 million A loan. Site preparation started in December 2016.

Original sector

V-AB - Gas - Thermal Power Generation

Location

Country

Brazil

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Raw Materials, Seaport, LNG, Geothermal, Natural Gas, Road, Manufacturing (Industrial), Power Generation (CCGT), Wind, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project