Celtic Interconnector
Sector: Wind • Location: Ireland
Source: Editorialge
The 700 MW Celtic Interconnector is a subsea cable linking Ireland to France, providing the first direct electrical link between Ireland and continental Europe. As of early 2026, terrestrial works in Ireland are nearing completion, with full commissioning and first power flow expected by 2028 following the completion of the French converter stations.
- Status
- Under Construction
- Sector
- Wind, Power Generation (CCGT)
- Location
- Ireland
- Updated
- 22 Jul 2026
- Source
- Editorialge
ConstructChat
Ask ConstructChat about Celtic Interconnector
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 700 MW Celtic Interconnector is a subsea cable linking Ireland to France, providing the first direct electrical link between Ireland and continental Europe. As of early 2026, terrestrial works in Ireland are nearing completion, with full commissioning and first power flow expected by 2028 following the completion of the French converter stations. |
Original sector | Energy |
Location
Country | Ireland |
Source
Source | Editorialge |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2026-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
