logo
ProjectUnder Construction

Celtic Interconnector

Sector: Wind • Location: Ireland

Source: Editorialge

The 700 MW Celtic Interconnector is a subsea cable linking Ireland to France, providing the first direct electrical link between Ireland and continental Europe. As of early 2026, terrestrial works in Ireland are nearing completion, with full commissioning and first power flow expected by 2028 following the completion of the French converter stations.

Status
Under Construction
Sector
Wind, Power Generation (CCGT)
Location
Ireland
Updated
22 Jul 2026
Source
Editorialge

ConstructChat

Ask ConstructChat about Celtic Interconnector

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Celtic Interconnector” is an infrastructure initiative in the Wind sector, located in Ireland. Taiyo aggregates data on it from Editorialge.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 700 MW Celtic Interconnector is a subsea cable linking Ireland to France, providing the first direct electrical link between Ireland and continental Europe. As of early 2026, terrestrial works in Ireland are nearing completion, with full commissioning and first power flow expected by 2028 following the completion of the French converter stations.

Original sector

Energy

Location

Country

Ireland

Source

Source

Editorialge

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT)

Article published date

2026-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project