Centennial Bowl Interchange Final Phase
Sector: Bridge • Location: Las Vegas, Nevada, United States
Source: Las Vegas Review-Journal
Final phase estimated at $110 million to upgrade the 215 Beltway to a divided, six-lane freeway through the interchange, construct ramps connecting eastbound Beltway to northbound U.S. 95 and Beltway to southbound U.S. 95, build frontage roads, and realign Oso Blanca Road. Expected to take two years after phase 2 completion.
- Status
- Prospective
- Sector
- Bridge
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Las Vegas Review-Journal
ConstructChat
Ask ConstructChat about Centennial Bowl Interchange Final Phase
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Final phase estimated at $110 million to upgrade the 215 Beltway to a divided, six-lane freeway through the interchange, construct ramps connecting eastbound Beltway to northbound U.S. 95 and Beltway to southbound U.S. 95, build frontage roads, and realign Oso Blanca Road. Expected to take two years after phase 2 completion. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Las Vegas Review-Journal |
URL |
More Details
Record type | Project |
Sector | Bridge |
Article published date | 2026-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Atlas Air Worldwide and Titan Aviation Holdings Announce Financing Facilities with CDPQ, BNP Paribas, and volofin
- Route 29 Tunnel, Trenton, NJ
- Ortega Highway Interchange Replacement Project
- Elgin O’Hare Western Access Project, Illinois
- Queen Elizabeth Way Widening
- I-485 Charlotte Outer Loop, North Carolina
- Kosciuszko Bridge Replacement Project, New York, US
- Complete 540 (Triangle Expressway Southeast Extension), North Carolina
