Centennial Pumped Hydro Energy Storage

Sector: Energy Storage • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Centennial Pumped Hydro Energy Storage project will perform a series of technical studies and trials for the potential deployment of a nominal 600 MW pumped hydro energy storage (PHES) system using underground coal mining voids.Key resultsThe project determined that underground PHES would only be technically viable under a set of very specific conditions:Suitable longwall voids will need to be

Project Information FAQ

Project Information

5 Q
The project “Centennial Pumped Hydro Energy Storage” is an infrastructure initiative in the Energy Storage sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Centennial Pumped Hydro Energy Storage project will perform a series of technical studies and trials for the potential deployment of a nominal 600 MW pumped hydro energy storage (PHES) system using underground coal mining voids.Key resultsThe project determined that underground PHES would only be technically viable under a set of very specific conditions:Suitable longwall voids will need to be composed of high strength rock and be at relatively shallow depths so saturation-induced collapse is minimal.The longwalls will need to be relatively narrow so that there are relatively more high porosity/conductivity edges.The coal seams mined will need to have very low gas contents and a low propensity to spontaneous combustion.The following challenges were identified during the first stage of the project:It is unlikely that a PHES scheme can be operated concurrently with longwall extraction and that the infrastructure required for PHES can be installed while mining in anticipation of such a scheme later.Planning laws have not envisaged an underground coal mine being used as an underground PHES. While planning approval pathways were identified, work would be required with government regulators to confirm permissibility once a definitive project is identified.As underground PHES may produce fugitive emissions, the risk that a carbon tax or alternative emissions scheme is introduced will impact economics.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data