Center Drive Capacity Upgrades
Sector: Water Supply and Storage • Location: Palo Alto, California, United States of America
Source: Dodge USA
This project provides funding to remove and replace approximately 1,710 linear feet of the existing storm drain pipes of various sizes (12 and 15 inches) with new 36-inch high-density polyethylene storm drain pipes, and add approximately 330 linear feet of new pipe from Hamilton Avenue to Channing Drive in order to increase the storm drain capacity. The pipes will continue to drain to Channing Dri
- Status
- Prospective
- Sector
- Water Supply and Storage, Chemical (Industrial), Road, Government, Tunnel, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Palo Alto, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Center Drive Capacity Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project provides funding to remove and replace approximately 1,710 linear feet of the existing storm drain pipes of various sizes (12 and 15 inches) with new 36-inch high-density polyethylene storm drain pipes, and add approximately 330 linear feet of new pipe from Hamilton Avenue to Channing Drive in order to increase the storm drain capacity. The pipes will continue to drain to Channing Drive, but this project will provide overflow to the Hamilton Avenue system. The project also includ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Palo Alto |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Road, Government, Tunnel, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
