Center Street Bridge Seismic Retrofit
The owner, status and timeline of this project. A free account opens every field.
Source: Statesman Journal
The project involves a seismic retrofit of the Center Street Bridge to strengthen it so it remains usable after an earthquake. The retrofit will allow the bridge to be routed for two-way traffic post-earthquake. The current Center Street Bridge and the Marion Street Bridge are not expected to withstand a major earthquake. The project will involve extended lane closures and traffic backups during c
- Status
- Prospective
- Sector
- Transportation
- Location
- Salem, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Statesman Journal
ConstructChat
Ask ConstructChat about Center Street Bridge Seismic Retrofit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves a seismic retrofit of the Center Street Bridge to strengthen it so it remains usable after an earthquake. The retrofit will allow the bridge to be routed for two-way traffic post-earthquake. The current Center Street Bridge and the Marion Street Bridge are not expected to withstand a major earthquake. The project will involve extended lane closures and traffic backups during construction, which is set to begin later in the year 2026. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Oregon |
City | Salem |
Source
Source | Statesman Journal |
URL |
More Details
Record type | Project |
Article published date | 2026-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project