Central African Republic - First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present intervention concerns the First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures. The intervention in Bangui will be carried out in two phases. A first phase, to be carried out over a period of 6 months, will consist of emergency work to rehabilitate pumping and water treatment stations, complementary to those financed by the World Bank. In a
- Sector
- Commercial, Warehouse, Water Supply and Storage, Government, Automotive
- Location
- Central African Republic
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Central African Republic - First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention concerns the First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures. The intervention in Bangui will be carried out in two phases. A first phase, to be carried out over a period of 6 months, will consist of emergency work to rehabilitate pumping and water treatment stations, complementary to those financed by the World Bank. In a second phase, the sub-programme will finance the preparation of the studies of Preliminary Summary Projects (PSA) and Detailed Preliminary Projects (DPP) and Tender Documents (DTP) for the priority tranche identified following the study of the Bangui City Water Supply Master Plan. The sub-programme sought to: (i) restore the nominal drinking water production capacity of the only pumping station in Bangui by raising it from 750 m3 /hour to 1,500 m3 /hour; and (ii) increase drinking water and sanitation coverage rates from 28% and 1.7%, respectively, to 67% and 10% by 2015 in the targeted rural areas, while supporting the reintegration of people into their respective communities. The components of the sub-programme are: (i) institutional capacity-building; (ii) development of drinking water supply and sanitation infrastructure; (iii) sub-programme management, knowledge management and monitoring and evaluation. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Central African Republic (CAR) |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Warehouse, Water Supply and Storage, Government, Automotive |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Central African Republic
- Central African Republic - First Sector Sub-Programme for Drinking Water and Sanitation in Bangui and Surrounding Rural Areas - Additional Project in Mambéré-Kadéï, Nana-Mambéré and Ouham Prefectures
- Orange Centrafrique S.A. (Orange RCA)
- Central African Republic - Support Project for the Strategy for the Transformation of Central African Agriculture and the Promotion of Youth Entrepreneurship in the Agricultural and Agrobusiness Sector
- CAR Internet EXchange Point
- Central African Republic - Economic And Financial Reforms Support Programme (PAREF) - Phase II
- Central African Republic - The Bangui Mpoko Airport Modernisation Support Programme (PAMAB)
- Central African Republic - Support project for the national civil aviation authority (ANAC)
- Central African Republic - The Project for Community Development and Support to Vulnerable Groups (PDCAGV)
