logo
Project

Central African Republic - First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The present intervention concerns the First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures. The intervention in Bangui will be carried out in two phases. A first phase, to be carried out over a period of 6 months, will consist of emergency work to rehabilitate pumping and water treatment stations, complementary to those financed by the World Bank. In a

Sector
Commercial, Warehouse, Water Supply and Storage, Government, Automotive
Location
Central African Republic
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Central African Republic - First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Central African Republic - First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures” is an infrastructure initiative in the Commercial sector, located in Central African Republic. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present intervention concerns the First Sector Sub-Programme for Drinking Water Supply and Sanitation in Bangui and Four Prefectures. The intervention in Bangui will be carried out in two phases. A first phase, to be carried out over a period of 6 months, will consist of emergency work to rehabilitate pumping and water treatment stations, complementary to those financed by the World Bank. In a second phase, the sub-programme will finance the preparation of the studies of Preliminary Summary Projects (PSA) and Detailed Preliminary Projects (DPP) and Tender Documents (DTP) for the priority tranche identified following the study of the Bangui City Water Supply Master Plan. The sub-programme sought to: (i) restore the nominal drinking water production capacity of the only pumping station in Bangui by raising it from 750 m3 /hour to 1,500 m3 /hour; and (ii) increase drinking water and sanitation coverage rates from 28% and 1.7%, respectively, to 67% and 10% by 2015 in the targeted rural areas, while supporting the reintegration of people into their respective communities. The components of the sub-programme are: (i) institutional capacity-building; (ii) development of drinking water supply and sanitation infrastructure; (iii) sub-programme management, knowledge management and monitoring and evaluation.

Original sector

Water Supply & Sanitation

Budget

Location

Country

Central African Republic (CAR)

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Warehouse, Water Supply and Storage, Government, Automotive

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project