Central Avenue Water Main Replacement
Sector: Water Supply and Storage • Location: Dover, New Hampshire, United States of America
Source: Dodge USA
This project will install a new water main in Central Ave from Broadway to Abbey Sawyer Memorial Highway and in Abbey Sawyer Memorial Highway from Central Ave to the Garrison Hill Water Tank to replace an 1880 s vintage cast iron main that is original to the system.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government, Metal, Steel
- Location
- Dover, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Central Avenue Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will install a new water main in Central Ave from Broadway to Abbey Sawyer Memorial Highway and in Abbey Sawyer Memorial Highway from Central Ave to the Garrison Hill Water Tank to replace an 1880 s vintage cast iron main that is original to the system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Dover |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government, Metal, Steel |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
