Central Business District Resurfacing Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Scope of Work consists of a variable depth removal of the existing asphalt surface in order to correct the crown in the roadway, followed by replacement with a new 2 asphalt overlay for approximately 1.01 miles of roadway and the addition of concrete paver crosswalks. Replacement of underlying concrete slabs may be necessary in isolated locations as conditions require. Existing curb ramps will
- Status
- Closed
- Sector
- Road, Commercial, Car parking, Automotive, Government, Cement, Manufacturing (Industrial)
- Location
- Clayton, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Central Business District Resurfacing Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Scope of Work consists of a variable depth removal of the existing asphalt surface in order to correct the crown in the roadway, followed by replacement with a new 2 asphalt overlay for approximately 1.01 miles of roadway and the addition of concrete paver crosswalks. Replacement of underlying concrete slabs may be necessary in isolated locations as conditions require. Existing curb ramps will be replaced in order to bring them into ADA compliance and select signal detector loops will req... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Clayton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Car parking, Automotive, Government, Cement, Manufacturing (Industrial) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
