Central East Transfer-Out Project - New Transmission Line
Sector: Power Transmission • Location: Red Deer, Alberta, Canada
Source: Dodge USA
A proposed new Alberta transmission line that will add 750 MW of electrical capacity to the Alberta grid. The new transmission line to be constructed in the counties of Red Deer , Lacombe and Stettler.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Commercial
- Location
- Red Deer, Alberta, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Central East Transfer-Out Project - New Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A proposed new Alberta transmission line that will add 750 MW of electrical capacity to the Alberta grid. The new transmission line to be constructed in the counties of Red Deer , Lacombe and Stettler. |
Budget |
Location
Country | Canada |
State | Alberta |
City | Red Deer |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
