Central Geotermoelectrica Los Humeros Unit Addition
Sector: Geothermal • Location: Perote, Veracruz, Mexico
Source: Industrial Info Resources
A 25-MW geothermal unit addition located in Perote, Veracruz, Mexico, at the existing 115-MW Los Humeros Geothermal Power station operated by Comision Federal de Electricidad.
- Status
- Prospective
- Sector
- Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Power Transmission
- Location
- Perote, Veracruz, Mexico
- Updated
- 22 Jul 2026
- Source
- Industrial Info Resources
ConstructChat
Ask ConstructChat about Central Geotermoelectrica Los Humeros Unit Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 25-MW geothermal unit addition located in Perote, Veracruz, Mexico, at the existing 115-MW Los Humeros Geothermal Power station operated by Comision Federal de Electricidad. |
Original sector | Power |
Location
Country | Mexico |
State | Veracruz |
City | Perote |
Source
Source | Industrial Info Resources |
URL |
More Details
Record type | Project |
Sector | Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Power Transmission |
Article published date | 2026-07-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Mexico
- Noroeste Topolobampo II Power Plant
- Valladolid III
- Transportadora de Gas Natural Baja California
- Energia de Celaya S.A. de C.V.
- Agua Prieta II Integrated Solar Combined Cycle Power Plant Sonora
- San Luis Potosi Wastewater Treatment
- HSBC Central Bank Mandatory Reserves Coverage
- La Pimienta A/B Bond Solar Project
