Central Java Coal-Fired IPP
Sector: Commercial • Location: Central Java, Indonesia
Source: World Bank Group
Central Java Coal-Fired Power Plant is a 2000 MW super critical coal-fired power facility, which will burn locally produced sub-bituminous coal in Central Java, Indonesia. The project also includes transmission facilities which are expected to improve access to electricity to 7.5 million people.
PT Bhimasena Power Indonesia (BPI) will develop the plant as a PPP on a 30-year build-own-operate-tran
- Status
- Prospective
- Sector
- Commercial, Government, Power Generation (CCGT)
- Location
- Central Java, Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Central Java Coal-Fired IPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Central Java Coal-Fired Power Plant is a 2000 MW super critical coal-fired power facility, which will burn locally produced sub-bituminous coal in Central Java, Indonesia. The project also includes transmission facilities which are expected to improve access to electricity to 7.5 million people. PT Bhimasena Power Indonesia (BPI) will develop the plant as a PPP on a 30-year build-own-operate-transfer (BOOT) basis. The electricity generated from the project would be sold to government of Indonesia for a period of 25 years through a power purchase agreement. PT Bhimasena Power Indonesia (BPI) is the project company for Central Java, and is owned by sponsors Adaro (34%), J-Power (34%) and Itochu (32%). Out of 30 firms that expressed interest, seven consortia were pre-qualified based on their technical and financial strength. Of these, four consortia—Marubeni (Japan), J-Power (Japan), Shenhua (China), and Guangdong Yudean (China) —submitted bids in April 2011. The winner, a consortium between J-Power, Itochu Corporation and Indonesia’s Adaro Power, was the lowest bidder for the price of electricity among those who met administrative and technical criteria. The consortium was awarded the project in June 2011. The project agreements, including the PPA and the Guarantee Agreement for the Central Java IPP project, were signed in October 2011. The project achieved financial close on 7 June 2016. JBIC will be providing around 60%, or $2 billion, of the total debt package of $3.5 billion. The lead arrangers on the remaining debt of $1.3 billion are a syndicate of Japanese and Singaporean banks: Bank of Tokyo Mitsubishi UFJ, DBS, Mizuho, Oversea-Chinese Banking Corporation and Sumitomo Mitsui Banking Corporation. Debt/Equity Ratio is 80:20. The new 2,000 MW coal-power plant is expected to commence operation by 2020. IFC provided advice to the PLN to structure and implement a PPP to find a private-sector investor through a transparent, competitive tender process in a difficult business environment. https://ijglobal.com/data/transaction/19236/central-java-coal-fired-power-plant-2000mw-ppp https://www.jbic.go.jp/en/information/press/press-2016/0603-48595 http://www.ifc.org/wps/wcm/connect/aaf1fb804a1b07068e30ffdd29332b51/SuccessStories_CentralJava.pdf?MOD=AJPERES |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Indonesia |
State | Central Java |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Power Generation (CCGT) |
Article published date | 2024-05-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
