Central Kootenay - East McDermid Dam Decommissioning
Source: Infrastructure Canada
The goal of the projects is to decommission the East McDermid Dam and associated reservoir to reduce the risk of flooding for downstream residences and infrastructure (including increased protection to 50-100 residents). The dam has been identified as a flood hazard to downstream properties due to the potential for entrainment of material (debris flow) and a resulting significant increase in volum
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The goal of the projects is to decommission the East McDermid Dam and associated reservoir to reduce the risk of flooding for downstream residences and infrastructure (including increased protection to 50-100 residents). The dam has been identified as a flood hazard to downstream properties due to the potential for entrainment of material (debris flow) and a resulting significant increase in volume. Removal of the dam and restoration of the reservoir and stream channel would eliminate the flood hazard. Construction activities include: clearing and grubbing, installation of water diversion around dam, equipment access, excavation, restoration of the stream bed, stabilization of the stream banks, and revegetation. Planning and permitting Contractor Procurement Construction, including mobilization and demobilization, excavation and site restoration. Key steps include clearing and grubbing, installation of water diversion around dam, equipment access, excavation, restoration of the stream bed, stabilization of the stream banks, and revegetation. Completion reporting |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
