logo

Central Kootenay - East McDermid Dam Decommissioning

Sector: Hydro • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The goal of the projects is to decommission the East McDermid Dam and associated reservoir to reduce the risk of flooding for downstream residences and infrastructure (including increased protection to 50-100 residents). The dam has been identified as a flood hazard to downstream properties due to the potential for entrainment of material (debris flow) and a resulting significant increase in volum

Status
Closed
Sector
Hydro, Water Supply and Storage, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Central Kootenay - East McDermid Dam Decommissioning

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Central Kootenay - East McDermid Dam Decommissioning” is an infrastructure initiative in the Hydro sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The goal of the projects is to decommission the East McDermid Dam and associated reservoir to reduce the risk of flooding for downstream residences and infrastructure (including increased protection to 50-100 residents). The dam has been identified as a flood hazard to downstream properties due to the potential for entrainment of material (debris flow) and a resulting significant increase in volume. Removal of the dam and restoration of the reservoir and stream channel would eliminate the flood hazard. Construction activities include: clearing and grubbing, installation of water diversion around dam, equipment access, excavation, restoration of the stream bed, stabilization of the stream banks, and revegetation. Planning and permitting Contractor Procurement Construction, including mobilization and demobilization, excavation and site restoration. Key steps include clearing and grubbing, installation of water diversion around dam, equipment access, excavation, restoration of the stream bed, stabilization of the stream banks, and revegetation. Completion reporting

Original sector

Climate Resilience

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project