Central Maintenance Facility CMF Food Dispensary Renovation
Sector: Raw Materials • Location: Los Angeles, California, United States of America
Source: Dodge
Central Maintenance Facility CMF Food Dispensary Renovation. Renovation of existing Food Dispensary located at the Central Maintenance Facility (CMF) Building 1. The renovation is part of the Capital Improvement Program (CIP) to renew and enhance bus facilities and infrastructure.
- Status
- Closed
- Sector
- Raw Materials, Automotive, Commercial, Consumer Products, Government
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Central Maintenance Facility CMF Food Dispensary Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Central Maintenance Facility CMF Food Dispensary Renovation. Renovation of existing Food Dispensary located at the Central Maintenance Facility (CMF) Building 1. The renovation is part of the Capital Improvement Program (CIP) to renew and enhance bus facilities and infrastructure. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Automotive, Commercial, Consumer Products, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
