Central Office Parking Lot Extension
Sector: Commercial • Location: Roanoke, Virginia, United States of America
Source: Dodge USA
Excavate area for base stone and dispose of spoils. Apply 21-A stone base up to 6 . Grade area to provide proper drainage. Apply 2.5 of standard asphalt base and apply 1.5 of IM-19 asphalt mix with compaction. Apply line striping for up to 50 parking spaces at 18 long. The approximate area to be paved is 26,000 square feet. Contractors must confirm area with their own measurements as 26,000 square
- Status
- Closed
- Sector
- Commercial, Car parking, Residential, Road, Automotive, Government, Waste Processing and Treatment
- Location
- Roanoke, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Central Office Parking Lot Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Excavate area for base stone and dispose of spoils. Apply 21-A stone base up to 6 . Grade area to provide proper drainage. Apply 2.5 of standard asphalt base and apply 1.5 of IM-19 asphalt mix with compaction. Apply line striping for up to 50 parking spaces at 18 long. The approximate area to be paved is 26,000 square feet. Contractors must confirm area with their own measurements as 26,000 square feet (325 x 80 ) is an approximation of the actual area to be paved. See Attachment C paving map... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Roanoke |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Residential, Road, Automotive, Government, Waste Processing and Treatment |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
