Central Park Main No. 2 Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work includes geotechnical, environmental, and geoenvironmental engineering services, utility locates, and sound engineering noise mitigation strategies design services for the design and construction of the Central Park Main No. 2 - 10th Ave to Westburnco section, which consists of approximately 4,500 meter of 600 mm diameter ductile iron pipe extending along Edinburgh Street and 7th Avenue b
- Status
- Prospective
- Sector
- Metal, Water Supply and Storage, Car parking, Power Transmission, Road, Mass Transit, Government, Automotive, Steel, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Metro Vancouver, British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Central Park Main No. 2 Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The work includes geotechnical, environmental, and geoenvironmental engineering services, utility locates, and sound engineering noise mitigation strategies design services for the design and construction of the Central Park Main No. 2 - 10th Ave to Westburnco section, which consists of approximately 4,500 meter of 600 mm diameter ductile iron pipe extending along Edinburgh Street and 7th Avenue between 16th Street and the Westburnco Reservoir. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Metro Vancouver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Car parking, Power Transmission, Road, Mass Transit, Government, Automotive, Steel, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
