Central Peak Mixed Use
Sector: Car parking • Location: Kirkland, Washington, United States of America
Source: Dodge
construct a 4-story mixed use project with approximately 4,000 square feet of ground floor commercial area and 25 to 30 residential units (see Attachment 2). Parking is proposed within an at grade and below-grade structured parking.
- Status
- Prospective
- Sector
- Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive
- Location
- Kirkland, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Central Peak Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construct a 4-story mixed use project with approximately 4,000 square feet of ground floor commercial area and 25 to 30 residential units (see Attachment 2). Parking is proposed within an at grade and below-grade structured parking. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Kirkland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
