logo
ProjectStart

Central Peak Mixed Use

One of 10,000+ projects Taiyo tracks in Washington.

Source: Dodge

construct a 4-story mixed use project with approximately 4,000 square feet of ground floor commercial area and 26 residential units. Parking is proposed within an at grade and below-grade structured parking.

Status
Prospective
Sector
Car parking, Automotive, Residential, Manufacturing (Industrial), Commercial
Location
Kirkland, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Central Peak Mixed Use

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Central Peak Mixed Use” is an infrastructure initiative in the Car parking sector, located in Kirkland, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

construct a 4-story mixed use project with approximately 4,000 square feet of ground floor commercial area and 26 residential units. Parking is proposed within an at grade and below-grade structured parking.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Kirkland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Car parking, Automotive, Residential, Manufacturing (Industrial), Commercial

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project