logo

Central Plant Upgrade

Sector: Government • Location: Las Vegas, Nevada, United States of America

Source: Dodge USA

Project
Closed

Provide all labor, equipment, and material to upgrade the Central Plant at the Las Vegas Convention Center, located at 3150 Paradise Road, Las Vegas, Nevada. Demolition of the existing pre-2001 central plant piping and equipment. b. Demolition of the existing redwood cooling tower. c. Installation of new chillers, pumps, and associated valves and piping. d. Re-piping of the existing central plant

Status
Closed
Sector
Government, Road, Commercial
Location
Las Vegas, Nevada, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Central Plant Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Central Plant Upgrade” is an infrastructure initiative in the Government sector, located in Las Vegas, Nevada, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Provide all labor, equipment, and material to upgrade the Central Plant at the Las Vegas Convention Center, located at 3150 Paradise Road, Las Vegas, Nevada. Demolition of the existing pre-2001 central plant piping and equipment. b. Demolition of the existing redwood cooling tower. c. Installation of new chillers, pumps, and associated valves and piping. d. Re-piping of the existing central plant to be a variable primary configuration. e. Reconfiguration of piping to allow for simultaneous op...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Las Vegas

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Road, Commercial

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project