Central Polk Parkway US 17 to SR 60
Sector: Automotive • Location: Tallahassee, Florida, USA
Source: Florida Turnpike
This segment of the Central Polk Parkway SR 570B will be a fourlane two lanes in each direction toll facility that extends from US 17 to SR 60 a distance of more than two miles. Design is the third phase of the FDOTproject development process. Construction plans specifications and final estimates to build a project are developed during this phase.The Central Polk Parkway SR 570B design started in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | prospective |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This segment of the Central Polk Parkway SR 570B will be a fourlane two lanes in each direction toll facility that extends from US 17 to SR 60 a distance of more than two miles. Design is the third phase of the FDOTproject development process. Construction plans specifications and final estimates to build a project are developed during this phase.The Central Polk Parkway SR 570B design started in Summer 2020 and is ongoing. Current efforts within the project limits includeThis project is consistent with the Project Development and Environment PDE Study for the construction of the Central Polk Parkway SR 570B from U.S. 17 SR 35 to SR 60 in Polk County Florida. Approval of this study is documented in the State Environmental Impact Report SEIR that was signed on August 18 2021.FTE is at the forefront of planning for a safer more efficient and technologically advanced transportation system for the future. FTE continually seeks opportunities to integrate emerging transportation technologies that can help reduce congestion create mobility choices minimize environmental impacts and improve safety. FTE also recognizes that connected and automated vehicle CAV technologies hold unprecedented opportunities for enhancing mobility and increasing safety on our roadways. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
