logo

Central Polk Parkway US 17 to SR 60

Sector: Automotive • Location: Tallahassee, Florida, USA

Source: Florida Turnpike

Project
Prospective

This segment of the Central Polk Parkway SR 570B will be a fourlane two lanes in each direction toll facility that extends from US 17 to SR 60 a distance of more than two miles. Design is the third phase of the FDOTproject development process. Construction plans specifications and final estimates to build a project are developed during this phase.The Central Polk Parkway SR 570B design started in

Project Information FAQ

Project Information

3 Q
The project “Central Polk Parkway US 17 to SR 60” is an infrastructure initiative in the Automotive sector, located in Tallahassee, Florida, USA. Taiyo aggregates data on it from Florida Turnpike.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This segment of the Central Polk Parkway SR 570B will be a fourlane two lanes in each direction toll facility that extends from US 17 to SR 60 a distance of more than two miles. Design is the third phase of the FDOTproject development process. Construction plans specifications and final estimates to build a project are developed during this phase.The Central Polk Parkway SR 570B design started in Summer 2020 and is ongoing. Current efforts within the project limits includeThis project is consistent with the Project Development and Environment PDE Study for the construction of the Central Polk Parkway SR 570B from U.S. 17 SR 35 to SR 60 in Polk County Florida. Approval of this study is documented in the State Environmental Impact Report SEIR that was signed on August 18 2021.FTE is at the forefront of planning for a safer more efficient and technologically advanced transportation system for the future. FTE continually seeks opportunities to integrate emerging transportation technologies that can help reduce congestion create mobility choices minimize environmental impacts and improve safety. FTE also recognizes that connected and automated vehicle CAV technologies hold unprecedented opportunities for enhancing mobility and increasing safety on our roadways.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data