logo

Central Regional Wastewater System Chlorine and Sulfur Dioxide Containment Building Project

Sector: Natural Gas • Location: Dallas, Texas, United States

Source: Construction Equipment Guide

Project
Under Construction

A $108 million multi-year project led by Zachry Construction Corp. to upgrade the Trinity River Authority's Central Regional Wastewater System in Dallas. The project includes demolition of existing equipment and structures, modifications to existing facilities, and construction of new structures and associated equipment at the CRWS treatment plant. Scope includes sitework, grading, paving, stormwa

Status
Under Construction
Sector
Natural Gas, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT)
Location
Dallas, Texas, United States of America
Updated
22 Jul 2026
Source
Construction Equipment Guide

ConstructChat

Ask ConstructChat about Central Regional Wastewater System Chlorine and Sulfur Dioxide Containment Building Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Central Regional Wastewater System Chlorine and Sulfur Dioxide Containment Building Project” is an infrastructure initiative in the Natural Gas sector, located in Dallas, Texas, United States. Taiyo aggregates data on it from Construction Equipment Guide.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A $108 million multi-year project led by Zachry Construction Corp. to upgrade the Trinity River Authority's Central Regional Wastewater System in Dallas. The project includes demolition of existing equipment and structures, modifications to existing facilities, and construction of new structures and associated equipment at the CRWS treatment plant. Scope includes sitework, grading, paving, stormwater drainage, roadways, chemical solution piping, plant water piping, drain and stormwater piping, natural gas piping, and electrical and instrumentation systems. The work aims to modernize critical wastewater infrastructure and support safe, reliable plant operations through upgraded containment, utility, and systems improvements, including a new chlorine and sulfur dioxide containment building, a supplemental chlorine storage building, pump stations, and related improvements across the site.

Original sector

Water and Wastewater

Budget

Location

Country

United States of America (USA)

State

Texas

City

Dallas

Source

Source

Construction Equipment Guide

URL

More Details

Record type

Project

Sector

Natural Gas, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2026-05-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project