logo
ProjectClosed

Central Sewer Trunk

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Engineering Design Services (Services) for the Central Trunk Sewer Project CIP 24004 (Project). The Manteca Central Trunk Sewer system provides conveyance of wastewater for most of the City of Manteca s population that is located north of State Highway 120 to the City s northerly limits. The Central Trunk infrastructure is presented in Figure 5-7 as Project 6A, of the City s 2024 Wastewater Master

Status
Closed
Sector
Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
Location
Manteca, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Central Sewer Trunk

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Central Sewer Trunk” is an infrastructure initiative in the Water Supply and Storage sector, located in Manteca, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Engineering Design Services (Services) for the Central Trunk Sewer Project CIP 24004 (Project). The Manteca Central Trunk Sewer system provides conveyance of wastewater for most of the City of Manteca s population that is located north of State Highway 120 to the City s northerly limits. The Central Trunk infrastructure is presented in Figure 5-7 as Project 6A, of the City s 2024 Wastewater Master Plan. Engineering Design Services (Services) for the Central Trunk Sewer Project CIP 24004 (Proj...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Manteca

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial

Article published date

2025-08-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project