Central Street Pump Station & Force Main Improvements
Sector: Water Supply and Storage • Location: Bristol, New Hampshire, United States of America
Source: Dodge USA
The Project includes the following Work: New pumping station building with submersible chopper pumps and integral wet well and valve vault. New 10-inch HDPE Force Main 2000 feet long using directional drill and open trench construction technique. DESCRIPTION OF WORK (refer to Section 01010) The OWNER is replacing an existing wastewater pump station to increase its wet well capacity and address oth
- Status
- Under Construction
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial
- Location
- Bristol, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Central Street Pump Station & Force Main Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: New pumping station building with submersible chopper pumps and integral wet well and valve vault. New 10-inch HDPE Force Main 2000 feet long using directional drill and open trench construction technique. DESCRIPTION OF WORK (refer to Section 01010) The OWNER is replacing an existing wastewater pump station to increase its wet well capacity and address other critical issues within the station. As part of the project the OWNER is replacing the existing... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Bristol |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
