logo

Central Termica Loma de La Lata

Sector: Natural Gas • Location: Argentina

Source: World Bank Group

Project
Active

Loma de la Lata was built in 1994 by Central Puerto SA as an expansion of a larger project (see project 68 Central Puerto SA). Central Puerto SA was formed from a full divestiture of Puerto Nuevo and Nuevo Puerto, two generating units owned by Servicios Electricos del Gran Buenos Aires (Segba), an Argentinean state-owned utility. Loma de la Lata had three open cycle gas turbines and an installed c

Project Information FAQ

Project Information

4 Q
The project “Central Termica Loma de La Lata” is an infrastructure initiative in the Natural Gas sector, located in Argentina. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Loma de la Lata was built in 1994 by Central Puerto SA as an expansion of a larger project (see project 68 Central Puerto SA). Central Puerto SA was formed from a full divestiture of Puerto Nuevo and Nuevo Puerto, two generating units owned by Servicios Electricos del Gran Buenos Aires (Segba), an Argentinean state-owned utility. Loma de la Lata had three open cycle gas turbines and an installed capacity of 369MW. The plant was strategically located near the Loma de la Lata gas field. In May 2007, Pampa Energia SA acquired 100% of the shares of Loma de La Lata and renamed the project company Central Termica Loma de La Lata SA. Pampa Energia SA [Argentina] was a subsidiary of Grupo Dolphin and related companies. In 2008, Pampa Energia SA financed an expansion of Loma de la Lata’s installed capacity by 178 MW through the conversion of the plant to a combined cycle facility. The project was to increase Loma de la Lata’s capacity by approximately 50% without additional gas consumption, resulting in increased efficiency for the whole plant. Loma de la Lata’s combined cycle was to operate at an efficiency of approximately 50% for 547 MW. The expansion reached financial closure on June 24, 2008 and comprised US $346.2 million debt and US $36.8 million equity. Debt was split between a US $88.2 million letter of credit facility, which accrued fees between 2% and 2.5%, an up to US $80 million, 5-year bridge facility with fees at LIBOR plus a margin between 4.75% and 5.50%, and a US $178 million bond issue. ABN Amro and Standard Bank were the joint mandated lead arrangers. The financing agreement contained guarantees such as an irrevocable unconditional guarantee by Pampa Energia, a first priority pledge on the shares of Central Termica, and the fiduciary assignment of certain rights of Central Termica.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data