Distressed

At the time of its privatization, the company owned a 650-MW thermal power plant and two power sales contracts which represent a total of 345-megawatts of electricity or 55% of its total output capability. The contracts, beginning in 1993, were set to expire in seven years. The company was privatized in two stages. In the first stage (April 1993), an 88% equity stake was sold for $66.1 million to

Status
Failure
Sector
Geothermal, Natural Gas, Oil and Gas, Power Generation (CCGT), Government
Location
Autonomous City of Buenos Aires, Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Central Termica San Nicolas SA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Central Termica San Nicolas SA” is an infrastructure initiative in the Geothermal sector, located in Autonomous City of Buenos Aires, Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Distressed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

At the time of its privatization, the company owned a 650-MW thermal power plant and two power sales contracts which represent a total of 345-megawatts of electricity or 55% of its total output capability. The contracts, beginning in 1993, were set to expire in seven years. The company was privatized in two stages. In the first stage (April 1993), an 88% equity stake was sold for $66.1 million to AES, CMS Generation, CEA, and Ormas SAICIC. The winning consortium also assumed $61 million in debt. AES acquired the entire 88% stake from its other partners in 1995. In the second stage, 12% of the equity was sold to its workers. Central Termica San Nicolas (CTSN) consists of five operational generating units, two of which are fueled with oil and coal, two of which can be fueled with oil or natural gas, and one of which is 350-megawatts and can burn on oil, natural gas, or coal and petroleum coke blend. Electricity not sold under contract is sold on the Argentina spot market. CTSN obtained a $60 million loan in December 1, 1996 to finance the construction of a power plant. In 2002, AES Corporation filed legal proceedings with an international arbitration tribunal (International Centre for Settlement of Investment Disputes - ICSID) against the Argentinean government. The proceeding seeks compensation for losses incurred by the company at the time of the devaluation of the Argentinean currency. For updates on the international arbitration proceedings, check http://www.worldbank.org/icsid (cases # ARB/02/17). None

Original sector

Energy

Budget

Location

Country

Argentina

State

Autonomous City of Buenos Aires

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Natural Gas, Oil and Gas, Power Generation (CCGT), Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project