logo

Central Texas Turnpike System

Sector: Commercial • Location: Texas Metropolitan Area, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

When the TIFIA loan closed, the Central Texas Turnpike System (CTTS) - now simply referred to as Austin Area Toll Roads - consisted of three contiguous toll highways serving the Austin metropolitan region and the Austin-San Antonio corridor:

SH 45 North - 13 miles, four to six lanes, from Ridgeline Boulevard west of U.S. 183 eastward to SH 130 Loop 1 - a northw

Project Information FAQ

Project Information

5 Q
The project “Central Texas Turnpike System” is an infrastructure initiative in the Commercial sector, located in Texas Metropolitan Area, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

When the TIFIA loan closed, the Central Texas Turnpike System (CTTS) - now simply referred to as Austin Area Toll Roads - consisted of three contiguous toll highways serving the Austin metropolitan region and the Austin-San Antonio corridor: SH 45 North - 13 miles, four to six lanes, from Ridgeline Boulevard west of U.S. 183 eastward to SH 130 Loop 1 - a northward extension of the existing Loop 1 (Mopac Expressway), three miles from Parmer Lane to SH 45 North SH 130 (Segments 1-4) - a 49-mile, four-lane tollway extending north-south through Williamson and Travis Counties, extending from I-35 north of Georgetown to US 183 southeast of Austin. SH 130 (Segments 1-4) was procured through Texas' first application of its Exclusive Development Agreement (later Comprehensive Development Agreement) provision, contractual arrangements equivalent to public-private partnerships. In this case, a design-build contract was used to accelerate completion. All three components are open. In November 2006, Loop 1 and portions of SH 45 and SH 130 opened to traffic. The remainder of SH 45 opened in April 2007. All of SH 130 (Segments 1-4) was open by April 2008. SH 130 is 91 miles in total length extending further south and west to I-10. Segments 5 and 6 were constructed under a separate DBFOM (design, build, finance, operate, and maintain) procurement. In August 2012, State Highway 45 Southeast (SH 45 SE) was added to the Central Texas Turnpike System. Service commenced on November 11, 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data