Central Utility Plant Interconnect DSH REBID
Sector: Energy Storage • Location: Norwalk, California, United States of America
Source: Dodge USA
Project comprises labor, material and services necessary for: Major components of Project Work consist of demolition of existing 66kv outdoor substation including all ancillaries and the 12kv switchgear inside the co-generation plant. Provide new 5kv switchgear (with provision for future automation and controls) and utility metering section. Provide battery, battery charger, enclosure, and battery
- Status
- Closed
- Sector
- Energy Storage, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Norwalk, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Central Utility Plant Interconnect DSH REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project comprises labor, material and services necessary for: Major components of Project Work consist of demolition of existing 66kv outdoor substation including all ancillaries and the 12kv switchgear inside the co-generation plant. Provide new 5kv switchgear (with provision for future automation and controls) and utility metering section. Provide battery, battery charger, enclosure, and battery calculation. Provide from spare circuit breaker of new switchgear temporary power supply to feed... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Norwalk |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
